As part of its ‘2018 Throughput Enhancement Program’, Western Australia’s grain cooperative, CBH Group, upgraded 13 Conveyor Loading Systems at nine different CBH grain storage/distribution sites throughout the south-west. The upgrade aimed to reduce the time it takes to in-load and out-load grain to provide faster turnaround times for growers and transporters.

CNF was brought on board by MEEC Electrical to do the electrical and control systems design. 

The Conveyor Loading systems included Conveyor Loading Augers or Elevator, Isolation Valves, Ground Conveyor, Stacker Loader, Storage Bin, Motor Control Centre and Field Control Panels. 

Resources and Links

Major Achievements

  • Power cable sizing.
  • Circuit breaker selection.
  • Circuit breaker protection settings.
  • Switchboard and field control panels drawings – Single line diagrams, schematic diagrams, termination diagrams, general arrangement drawings.
  • Electrical site layout drawings.
  • Electrical site cable schedules.
  • Switchboards FAT testing.
  • Site installation assistance
  • Site commissioning assistance.