Fire Safety and Supression

Fire Safety and Supression

Future proofing NextDC’s standby power system NEXTDC’s ‘P2’ Data Centre in Perth’s CBD is configured to have 12 standby diesel generators to ensure reliability and to maintain operations without interruption all day, everyday. The initial install consisted of three...
Process Control & Automation Design

Process Control & Automation Design

Future proofing NextDC’s standby power system NEXTDC’s ‘P2’ Data Centre in Perth’s CBD is configured to have 12 standby diesel generators to ensure reliability and to maintain operations without interruption all day, everyday. The initial install consisted of three...
HVAC Design

HVAC Design

Future proofing NextDC’s standby power system NEXTDC’s ‘P2’ Data Centre in Perth’s CBD is configured to have 12 standby diesel generators to ensure reliability and to maintain operations without interruption all day, everyday. The initial install consisted of three...
Mechanical Engineering

Mechanical Engineering

Distributing water throughout NSW’s Central Tablelands In July 2017 major construction started for a pipeline connecting numerous reservoirs around Orange, Millthorpe and Carcoar in the Central Tablelands region of NSW. The project was of vital significance to the...
Electrical Engineering

Electrical Engineering

Future proofing NextDC’s standby power system NEXTDC’s ‘P2’ Data Centre in Perth’s CBD is configured to have 12 standby diesel generators to ensure reliability and to maintain operations without interruption all day, everyday. The initial install consisted of three...